Tile Is One Line
on a Much Bigger Schedule
For a general contractor, tile isn't the project — it's one trade among a dozen others, competing for the same site access, the same delivery windows, and the same budget line that has to hold from bid submission to final handover. A supplier who can't hit a delivery date holds up drywall, flooring and final inspection right behind it.
You also can't afford a material cost swinging mid-build after you've already locked a fixed price with the property owner. We built our commercial supply process around the two things that actually determine whether a contractor works with us again: a bid-ready quote fast enough to use, and a spec that doesn't move once it's locked.
The Five Questions Every Contractor Asks First
Straight answers, no sales pitch — this is what governs every quote we send into a bid.
MOQ
From 500 m² per development. For multi-unit or multi-phase builds, we lock a single spec across the entire project — 20 units or 200 — so every unit matches regardless of build date.
Lead Time
Bid-stage quotes returned within 48 hours — fast enough for tender deadlines. Once awarded, stock series ship in 7 days; phased deliveries scheduled to your site's finish-trade sequence.
Packaging
Palletized for forklift handling and site crane access. Carton labelling can be coded by unit, lot or building number for multi-unit developments to simplify site receiving.
Certifications
ISO 9001, CE and ANSI A137.1 documentation for code compliance and inspection sign-off, plus written product warranty terms to support your own contract liability to the property owner.
Project Support
One account manager coordinating delivery timing with your project schedule, plus flexibility to handle late-stage substitutions or change orders without derailing your programme.
Series Most Specified for Multi-Unit Builds
Based on project history from our contractor and developer client base — durable, cost-stable choices for repeat-unit residential and mixed-use construction.
Image
Image
Image
Image
From Tender to Final Handover
Bid Quote
Send us the spec and volume — we return bid-ready pricing within 48 hours, valid through your tender window.
Award & Spec Lock
Once you're awarded the contract, we lock the spec and price for the full scope of the development.
Sample Sign-Off
Physical samples approved by your project team before production — this becomes the reference for every phase.
Scheduled Delivery
Material lands per your finish-trade schedule — coordinated so tile doesn't sit on site ahead of other trades.
Handover & Warranty
Final documentation package and written warranty terms provided for your handover file to the property owner.
Construction Company — Common Questions
Ready to Source Mosaic Tiles?
Get in touch with our export team for factory-direct pricing, or download our complete product catalog to view the full range.
A sourcing and export specialist for mosaic tile. We work with a curated factory partner network, run independent quality control, and handle full export logistics for importers, distributors and project buyers worldwide.