A 200-Room Programme Has
No Room for a Shade Mismatch
Hotel and large commercial fit-outs don't order once — they order in phases, often across 12 to 36 months, as construction reaches each floor or wing. A supplier who can't guarantee that batch 6 matches batch 1 forces you into an unplanned re-tiling job, a delayed opening date, or a visibly inconsistent finish the client will notice on day one.
We built our commercial supply process specifically around multi-phase programmes — because for a project of this scale, "close enough" on colour is not an acceptable standard.
The Five Questions Every Project Team Asks First
Straight answers, no sales pitch — this is what governs every commercial quote we send.
MOQ
Project-scale orders typically start from 500 m². For multi-phase programmes, we reserve production capacity against your total forecast volume, released per phase as construction progresses.
Lead Time
First-phase production: 30–45 days from sample approval. Subsequent phases on an approved spec ship in 14–21 days, scheduled to your construction milestones, not held to a rigid factory calendar.
Packaging
Carton labelling coded to your finish schedule and area designation (e.g. Lobby, Floor 3 Corridor) to simplify site receiving and reduce installer error on large multi-area programmes.
Certifications
PEI IV–V wear rating, ISO 9001, CE and ANSI A137.1 documentation issued per phase shipment — ready for your project file, contractor submittals and developer sign-off.
Project Support
Dedicated project account manager for the life of the programme — coordinating with developer, contractor and design team through every phase, from first sample to final handover.
Series Most Specified for Hotel & Commercial Programmes
Based on project history from our hospitality and commercial client base — the categories that perform best under sustained guest traffic.
From Project Brief to Final Handover
Project Brief
Share total area, phasing plan and construction timeline. We confirm capacity and reserve production slots against your forecast.
Master Sample Approval
One approved sample becomes the reference standard for every phase shipment across the entire programme.
Phase 1 Production
First shipment produced and batch-matched to the master sample, with certification documentation for project sign-off.
Phased Delivery
Subsequent phases scheduled to your construction milestones — each batch verified against the master sample before shipment.
Handover & Attic Stock
Final phase includes recommended attic stock reserve for future repairs, plus full documentation archive for facilities management.
Material Arrives When Your Site Is Ready — Not Before
A single upfront shipment for a multi-year programme means either warehousing costs on your side or storage risk on ours. Instead, we structure delivery around your actual construction sequence, releasing production in step with each phase.
Overwater Villa Resort — 1,240 m² Across Three Phases
"Lobby, pool and 80 guest bathrooms delivered across three construction phases over 14 months. Every batch matched the original sample — no visible seam between phase one and phase three."