A 200-Room Programme Has
No Room for a Shade Mismatch
Hotel and large commercial fit-outs don't order once โ they order in phases, often across 12 to 36 months, as construction reaches each floor or wing. A supplier who can't guarantee that batch 6 matches batch 1 forces you into an unplanned re-tiling job, a delayed opening date, or a visibly inconsistent finish the client will notice on day one.
We built our commercial supply process specifically around multi-phase programmes โ because for a project of this scale, "close enough" on colour is not an acceptable standard.
The Five Questions Every Project Team Asks First
Straight answers, no sales pitch โ this is what governs every commercial quote we send.
MOQ
Project-scale orders typically start from 500 mยฒ. For multi-phase programmes, we reserve production capacity against your total forecast volume, released per phase as construction progresses.
Lead Time
First-phase production: 30โ45 days from sample approval. Subsequent phases on an approved spec ship in 14โ21 days, scheduled to your construction milestones, not held to a rigid factory calendar.
Packaging
Carton labelling coded to your finish schedule and area designation (e.g. Lobby, Floor 3 Corridor) to simplify site receiving and reduce installer error on large multi-area programmes.
Certifications
PEI IVโV wear rating, ISO 9001, CE and ANSI A137.1 documentation issued per phase shipment โ ready for your project file, contractor submittals and developer sign-off.
Project Support
Dedicated project account manager for the life of the programme โ coordinating with developer, contractor and design team through every phase, from first sample to final handover.
Series Most Specified for Hotel & Commercial Programmes
Based on project history from our hospitality and commercial client base โ the categories that perform best under sustained guest traffic.
Image
Image
Image
Image
From Project Brief to Final Handover
Project Brief
Share total area, phasing plan and construction timeline. We confirm capacity and reserve production slots against your forecast.
Master Sample Approval
One approved sample becomes the reference standard for every phase shipment across the entire programme.
Phase 1 Production
First shipment produced and batch-matched to the master sample, with certification documentation for project sign-off.
Phased Delivery
Subsequent phases scheduled to your construction milestones โ each batch verified against the master sample before shipment.
Handover & Attic Stock
Final phase includes recommended attic stock reserve for future repairs, plus full documentation archive for facilities management.
Hotel & Commercial Project โ Common Questions
Ready to Source Mosaic Tiles?
Get in touch with our export team for factory-direct pricing, or download our complete product catalog to view the full range.
A sourcing and export specialist for mosaic tile. We work with a curated factory partner network, run independent quality control, and handle full export logistics for importers, distributors and project buyers worldwide.